A tilt panel or steel warehouse shell costs about $840 to $1,960 per square metre to build, and attached offices $1,980 to $3,900 (Rider Levett Bucknall, excluding GST, land and hardstand). Small-lot industrial land averages $670 to $1,096 per square metre. Our worked 8-unit Brisbane estate costs about $7.2 million, or $897,000 a unit.

$840 to $1,960per m2, warehouse shell on a 4,500 m2 building, five capitals (RLB, Q4 2025, ex GST)
$670 to $1,096per m2, average small-lot industrial land, Perth to Brisbane (Knight Frank, Q1 and Q2 2026)
$897,000per unit, total cost of a worked 8-unit estate (our arithmetic)
4 of 10new-unit listings we opened that show any price

A small industrial estate is a simple building on expensive land. The shed is cheap per square metre; the site, the hardstand, the council and the finance are what push each unit towards $900,000. That is why the same 150 square metre unit asks about $430,000 in northern Tasmania and $1.2 million in Perth. This guide sets out the published build rates, small-lot land values, the council and strata fees we could price, what 10 new-unit projects in five states are asking, and a worked feasibility on an 8-unit estate, then how that estate is funded.

Published build costs for industrial units

Rider Levett Bucknall's Riders Digest 2026 prices a single-storey industrial building of 4,500 m2 gross floor area with 6.0 m to the underside of the truss. It describes the quality as a simplified type of construction suitable for light industry. Rates are per m2 of gross floor area, excluding GST, current at the fourth quarter of 2025. They exclude hardstandings, roadworks and special equipment, and the digest says they are indicative and for general guidance only. For the wider range of building types see our construction cost per square metre guide.

CityMetal (Zincalume) clad shellPrecast concrete clad shellAttached air-conditioned offices, 200 m2
Adelaide$1,140 to $1,560$1,360 to $1,760$2,200 to $2,750
Brisbane$1,360 to $1,800$1,460 to $1,960$3,100 to $3,500
Melbourne$1,160 to $1,600$1,280 to $1,740$2,850 to $3,550
Perth$840 to $1,240$840 to $1,600$1,980 to $3,000
Sydney$1,060 to $1,340$1,160 to $1,740$3,250 to $3,900

Three points matter for a unit estate. First, these rates are for a 4,500 m2 box, and a row of 150 m2 units has more wall, more roller doors and more services per square metre, so a small developer should price at the top of the range or above it (our assumption, not an RLB figure). Second, the office line is the expensive part: an office or mezzanine fit costs about double the shed floor under it. Third, the hardstand is not in the shed rate. RLB's Sydney edition prices heavy duty paving to a factory type complex at $6,000 to $7,600 per car space and a 10.4 m wide industrial estate road at $2,800 to $4,450 per metre, both with minimal site formation. A published industry rate for the whole site works package (earthworks, drainage, services, fencing) is not available, so the worked example below uses an allowance.

What small-lot industrial land costs

Industrial land is the largest single line in most small estates. Knight Frank publishes small-lot values (under 5,000 m2) by precinct. The table uses its latest report for each city we could open. We did not obtain a current published small-lot figure for Sydney.

CityAverage small-lot land valueRange by precinctPeriod
Brisbane$1,096 per m2$850 (south west) to $1,550 (Trade Coast)Q2 2026
Melbourne$918 per m2 (excluding City Fringe)$845 (west) to $1,025 (south east)Q2 2026
Adelaide$745 per m2$379 (outer north) to $1,092 (inner west)Q2 2026
Perth$670 per m2$525 (outer south) to $750 (north)Q1 2026

Knight Frank reports small-lot values up 10.5% over the year in Adelaide and 14.4% in Perth, while it describes Melbourne's land values as stable. On a 2,400 m2 site, Brisbane's south precinct at $875 per m2 comes to $2.1 million (our arithmetic). Land is also where owner-builders have an advantage: a builder or business owner who already holds the site carries it at cost, not at today's value.

Council, strata and GST

The council fee is small, but it is one of the few costs with a published schedule. Brisbane City Council's 2026-27 schedule charges a point value of $150. For industry, offices, shops or warehouses it charges $5,850 for the first 50 m2 and $600 for each further 100 m2 or part of it up to 2,050 m2. Subdividing into units under a community titles scheme is separate: survey plan endorsement is $2,700 for up to three units plus $750 for each additional unit, and each community management statement is $1,350. On the 1,520 m2 estate in the example below that is $14,850 for the use and $6,450 plus $1,350 for the units, about $22,700 in total (our arithmetic). Other councils charge differently, and infrastructure charges, which are not in these figures, are usually larger than the application fees. Our development soft costs guide prices the architect, engineers and reports.

GST. The ATO says that if you sell commercial premises such as shops, factories or offices you are generally liable for GST on the sale price, and you may be able to use the margin scheme, where GST is one-eleventh of the margin rather than of the whole price. A sale as a GST-free going concern, for example a leased unit sold with its tenant, is a separate rule. Which one applies to each unit decides what the buyer pays on top, so ask your accountant and solicitor before you set prices. All figures in this guide exclude GST unless the listing says otherwise.

What new strata units are asking

New strata units are priced by negotiation more often than by advertisement. Of the 10 projects below, which we opened on 6 November 2026, four show a price. The rest say contact the agent, so the table is a mix of price points and project facts. Figures are the agent's, indicative market data and not Ventas offers. Per m2 figures are our arithmetic on the building area shown. For existing units and bigger sheds see our guide to buying a warehouse.

ProjectSizePrice shownStatus
Acacia Ridge, QLD (CommercialReady 33428)49 to 423 m2, four unit typesFrom $450,000, GST not disclosedProposed, expression of interest, construction from December 2026, completion late 2027
Richlands, QLD (CommercialReady 33336)113 to 218 m2, 20 units, fitted with office mezzaninesNot disclosedUnder construction, handover anticipated February 2027
Upper Coomera, QLD (CommercialReady 33563)231 to 272 m2, 13 units, 4 remainingNot disclosedConstruction started, handover estimated Q2 2027
Yatala, QLD (Cushman and Wakefield, 2 Warehouse Circuit)14 units, sizes shown as 163 to 513 m2 and 389 to 491 m2Not disclosedBrand new, 3 lots remaining
Mandurah, WA (10 Lively Place, Altegra)33 units, about 150 to 499 m2Not disclosedOff the plan, completion targeted mid-2027
O'Connor, WA (REIWA 5054655, 7/7 Keegan Street)247 m2Offers from $1,235,000 plus GST, about $5,000 per m2Practical completion due 30 October 2026, shown as under offer
Latrobe, TAS (Elders, Unit 4/11 Anatola Court)162 m2 building, 349 m2 strata lot, listing ID not shownOffers over $430,000 plus GST, about $2,650 per m2Construction complete, strata title expected April 2026
Spreyton, TAS (Elders SU114257, Units 2 and 3/11 Orchard Crescent)About 197 and 199 m2$515,000 plus GST per unit, about $2,600 per m2Brand new tilt panel, Unit 3 under contract
Truganina, VIC (CommercialReady 32671, Mode Business Park East)Not disclosedNot disclosedMultiple units available, vacant possession
Ferryden Park, SA (CommercialReady 33402)About 230 m2Not disclosedBrand-new corporate office warehouses

The spread is the story. Northern Tasmania sells finished 160 to 200 m2 tilt panel units for about $2,600 per m2 of building, while the Perth unit is listed at about $5,000 per m2 and the Acacia Ridge entry price of $450,000 is for the smallest of four unit types. A developer's break-even per m2 has to sit under the local sale price per m2, and where land costs $875 or more per m2 that is hard to achieve at Tasmanian prices. Pre-sales and agent pricing change weekly, so treat any row as a prompt for a call to the agent.

Financing a small industrial unit estate

Banks, non-bank lenders and private lenders all fund small industrial estates, but not on the same terms. Feasly puts bank senior construction lending at commonly 60 to 70 per cent of end value and 70 to 80 per cent of total development cost, with substantial qualifying pre-sales. Our working view is that banks sit at the lower end of that on a speculative strata estate, non-bank lenders lend more of the cost with fewer pre-sales, and private lenders go further again at a higher price. Private lending is typically business-purpose and not consumer regulated. Ventas is a broker, not a lender, so we do not quote rates here.

Illustrative only, subject to lender assessment. An 8-unit estate in Brisbane's south west, on a 2,400 m2 site. Each unit has a 150 m2 warehouse and a 40 m2 office mezzanine, 1,520 m2 in all. Our assumptions: land at $875 per m2; shell at $1,900 per m2, the top of the RLB precast range; offices at $3,300 per m2; 24 car spaces at $6,800 each.

Cost lineAmount
Land, 2,400 m2 at $875$2,100,000
Eight units: 150 m2 shell and 40 m2 office each$3,336,000
Heavy duty hardstand, 24 spaces$163,000
Earthworks, drainage, services and fencing (allowance)$350,000
Council and strata fees (Brisbane schedule)$23,000
Design, engineering, surveyor and legal (allowance)$240,000
Infrastructure charges and utilities (allowance, not sourced)$120,000
Contingency at 5% of build and site works$192,000
Finance, selling and holding (allowance)$650,000
Total development cost$7,174,000

That is $896,750 a unit, or $4,720 per m2 of unit area (our arithmetic). Against the listings above, it needs a price near the Perth unit's $5,000 per m2 and well above northern Tasmania's $2,600. At $1,050,000 a unit the estate would gross $8.4 million, a margin on cost of about 17 per cent before tax and GST. At $950,000 it falls to about 6 per cent, which most lenders will not accept. So the feasibility lives or dies on land cost and the sale price per square metre.

And how it is typically funded:

Funding layerAmountWhat it coversSecured on
Senior construction facility, 65% of cost$4,663,000The build and part of the finance and selling costsFirst mortgage over the site, assignment of the building contract
Equity in the land$2,100,000The land at costThe land itself, or a property-backed loan against other property
Cash equity$411,000Consultants, fees and early costs before the first drawCash, or a loan on property you already own
Total$7,174,000

A non-bank lender at 70 per cent would lend about $5,022,000, but may still want a share of units contracted. Lenders are cautious about unit estates built without buyers. What makes the deal fundable is the sponsor and the evidence: a builder or owner-occupier who will take units themselves, signed contracts or deposits on a share of the units, a fixed-price build contract, a quantity surveyor's cost report, and comparable sales that support the price. A business owner building a unit to trade from, and selling the rest to clear the debt, is the easiest version to fund because the lender sees an end user.

To get a number from Ventas, send the site address and title, the approval or DA status, the plans, the builder's quote or QS estimate, your land equity and cash, and any contracts or deposits on the units. Start with development finance for how the whole stack fits together, then construction finance for the build facility and our answer on finance for a small commercial development. Finance is subject to lender assessment and approval.

Sources

This is general information only and not financial, credit, or tax advice. Figures are indicative market data from the sources listed, not Ventas offers, and move with the market. Consider your own circumstances and speak to a professional. All finance is subject to lender assessment and approval.

Frequently asked questions

How much does it cost to build an industrial unit in Australia?

Rider Levett Bucknall prices a 4,500 m2 warehouse shell at $840 to $1,960 per m2 across five capitals, and attached offices at $1,980 to $3,900 per m2, excluding GST, land and hardstand. Small units usually cost more per m2 than the large shed. Add land, site works, fees and finance.

How much does industrial land cost per square metre?

Knight Frank's latest reports put average small-lot (under 5,000 m2) land at $670 per m2 in Perth, $745 in Adelaide, $918 in Melbourne excluding the City Fringe, and $1,096 in Brisbane. Precinct values range from $379 to $1,550 per m2.

Do I pay GST when I sell new industrial units?

The ATO says selling commercial premises such as factories is generally subject to GST on the sale price, and the margin scheme may reduce the GST to one-eleventh of the margin. A sale as a going concern is a separate rule. Ask your accountant and solicitor for each unit.

What does it cost to subdivide an industrial site into strata units?

In Brisbane in 2026-27 the survey plan endorsement fee is $2,700 for up to three units plus $750 for each additional unit, and each community management statement is $1,350. Surveyors, solicitors and infrastructure charges are extra. Other councils charge differently.

Can I get finance to build industrial units to sell?

Yes, but lenders are cautious about unit estates built with no buyers. Banks typically want a share of units pre-sold and meaningful equity, non-bank lenders accept less cover, and private lenders go further at a higher cost. A fixed-price contract, a QS report and comparable sales help.

CM
Reviewed by Caleb Morehu, Co-founder, Ventas Asset Lending. Caleb structures asset, property-backed and development finance and negotiates directly with lenders. Every figure on this page is checked against what lenders are actually approving. About Ventas.

Get your number from the lender panel

The figures above are indicative. Tell us what you are buying and we will come back with the real rate and repayment, usually within a day. No upfront fees and no credit check to get a quote.

No upfront fees. We are paid by the lender at settlement.

The site, the build and the funding

Send us the site, the plans and your cost estimate. We will tell you how the land, the build and the presales can be funded, usually within a day.

This article is general information only and not financial, credit, or tax advice. Ventas Asset Lending is a finance broker, not a lender. Approvals are subject to lender assessment. Consider your own circumstances and speak to a qualified professional, including your accountant for any tax questions.